0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Schwanheimer Brücke
Beginning of works: 1905
Completion: 1907
Status: destroyed (26 March 1945)

Project Type

Structure: Through truss bridge
Material: Steel bridge
Function / usage: Road bridge
Support conditions:
Structure: Non-parallel chord truss bridge

Location

Location: , ,
Crossed:
  • Main River
Replaced by: Schwanheim Bridge (1963)
Coordinates: 50° 5' 21.56" N    8° 34' 52.17" E
Coordinates: 50° 5' 17.28" N    8° 34' 50.01" E
Show coordinates on a map

Technical Information

Dimensions

total length 292 m
deck deck width 9 m

Cost

cost of construction Reichsmark 368 000

Materials

truss steel

Chronology

26 March 1945, 06:00

Dynamited by retreating German troops.

1946 — 1947

A temporary bailey bridge is installed as replacement.

1954

Last strengthening of the bailey bridge.

1960 — 1963

Construction of a permanent replacement bridge.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005258
  • Published on:
    21/09/2002
  • Last updated on:
    28/02/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine