General Information
Name in local language: | Schwandbachbrücke |
---|---|
Beginning of works: | August 1933 |
Completion: | 29 November 1933 |
Status: | in use |
Project Type
Structure: |
Deck-stiffened arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Deck levels: |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
Location
Location: |
Hinterfultigen, Rüeggisberg, Bern, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 46° 49' 45.48" N 7° 24' 8.67" E |
Technical Information
Dimensions
main span | 37 m | |
total length | 55.6 m | |
roadway / carriageway width | 4.9 m | |
arch | width | 4.2 m |
Cost
cost of construction | Swiss Franc 47 298 |
Materials
deck |
reinforced concrete
|
---|---|
arch |
reinforced concrete
|
abutments |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Relevant Web Sites
Relevant Publications
- L'art de l'ingénieur. constructeur, entrepeneur, inventeur. Éditions du Centre Georges Pompidou, Paris (France), pp. 440-442. (1997):
- (2017): Restoration of Robert Maillart's Reinforced Concrete Bridges in Switzerland. In: (2017): Engineering History and Heritage Structures – Viewpoints and Approaches. International Association for Bridge and Structural Engineering (IABSE), Zurich (Switzerland), ISBN 978-3-85748-154-3, pp. 155-160.
- Robert Maillart. Designer, Builder, Artist. Cambridge University Press, Cambridge (United Kingdom), pp. 174-182. (1997):
- Robert Maillart. Verlag für Architektur, Zurich (Switzerland). (1949):
- Robert Maillart and the Art of Reinforced Concrete. The MIT Press, Cambridge (USA), pp. 66-70. (1990):
- About this
data sheet - Structure-ID
20000064 - Published on:
28/10/1998 - Last updated on:
03/04/2025