0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Schwandbachbrücke
Beginning of works: August 1933
Completion: 29 November 1933
Status: in use

Project Type

Awards and Distinctions

Location

Location: , , ,
Crosses:
  • Schwandbach Creek
Coordinates: 46° 49' 45.48" N    7° 24' 8.67" E
Show coordinates on a map

Technical Information

Dimensions

main span 37 m
total length 55.6 m
roadway / carriageway width 4.9 m
arch width 4.2 m

Cost

cost of construction Swiss Franc 47 298

Materials

deck reinforced concrete
arch reinforced concrete
abutments reinforced concrete
piers on arch reinforced concrete

Participants

Design
Contractor

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000064
  • Published on:
    28/10/1998
  • Last updated on:
    03/04/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine