General Information
Other name(s): | Schnettkerbrücke |
---|---|
Beginning of works: | 9 September 2005 |
Completion: | May 2012 |
Duration of works: | 79 months |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Half-through arch bridge |
Material: |
Steel bridge |
Location
Location: |
Dortmund, North Rhine-Westphalia, Germany |
---|---|
Crosses: |
|
Carries: |
|
Replaces: |
Schnettker Bridge (1931)
|
Coordinates: | 51° 29' 51.70" N 7° 26' 6.10" E |
Technical Information
Dimensions
arch | rise | 28.00 m |
span | 132 m | |
dome radius | 89.70 m | |
deck | girder depth | 3.80 m |
total width | 41.60 m | |
Northern bridge | ||
---|---|---|
total length | 328 m | |
span lengths | 68 m - 132 m - 59 m - 49 m | |
number of spans | 4 | |
Southern bridge | ||
total length | 308 m | |
span lengths | 68 m - 132 m - 73 m - 55 m | |
number of spans | 4 |
Quantities
substructure | concrete volume | 5 360 m³ |
reinforcing steel | 860 t | |
superstructure | structural steel | 5 600 t |
concrete volume | 6 560 m³ | |
reinforcing steel | 890 t |
Materials
deck |
composite
|
---|---|
arch |
steel
|
Participants
Owner
Client
Design
-
Ruhrberg Ingenieurgemeinschaft
- Winfried Neumann (designer)
- Ingrid Neumann (architect)
Structural engineering
Geotechnical/geological experts
Checking engineering
-
Weyer Beratende Ingenieure im Bauwesen GmbH
- Ulrich Weyer (checking engineer)
Contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2012. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2012, pp. 55-66.
- Neubau der Schnettkerbrücke. Entwurf und Ausführung. In: Brückenbau, v. 3, n. 1 ( 2011), pp. 44-47. (2011):