General Information
Name in local language: | Tunnel Schnelsen |
---|---|
Beginning of works: | January 2016 |
Completion: | December 2019 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel Noise reduction tunnel |
Construction method: |
Cut-and-cover method |
Location
Location: |
Hamburg-Schnelsen, Hamburg, Germany |
---|---|
Coordinates: | 53° 37' 40.16" N 9° 55' 17.04" E |
Coordinates: | 53° 37' 59.09" N 9° 55' 23.73" E |
Technical Information
Dimensions
width | ø 34 m | |
length | 550 m | |
number of lanes | 2 x 3 | |
number of tubes | 2 |
Quantities
concrete volume | 66 000 m³ | |
reinforcing steel | 10 000 t |
Materials
piles |
reinforced concrete
|
---|---|
tunnel structure |
reinforced concrete
|
Participants
Owner
Project implementation
PPP Contractor
Client for reference design
Reference project design
Client for final design
Design
Structural engineering
Soil investigation report
Architectural consulting
Checking engineering
- H. U. Ordemann (checking engineer)
Quality control
- Böger + Jäckle Gesellschaft Beratender Ingenieure mbH & Co. KG
- Ingenieurbüro Grassl GmbH Beratende Ingenieure Bauwesen
- Merkel Ingenieur Consult
Co-contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2020. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2020, pp. 133-145.
- About this
data sheet - Structure-ID
20080955 - Published on:
07/04/2021 - Last updated on:
07/04/2021