0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Muldenbrücke Schlunzig
Beginning of works: 16 April 2018
Completion: 29 May 2020
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Zwickauer Mulde River
Coordinates: 50° 47' 20.53" N    12° 30' 25.63" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 34.50 m - 55.50 m
number of spans 2
total width 15.10 m
roadway / carriageway width 6.50 m
cycleway width 3.00 m
walkway length 1.50 m
pylon height 30.60 m

Materials

pylon reinforced concrete
deck reinforced concrete
abutments reinforced concrete

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20077106
  • Published on:
    25/03/2019
  • Last updated on:
    16/11/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine