0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Official designation: BW 111/47
Beginning of works: September 2001
Completion: October 2002
Duration of works: 14 months
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Autobahn A71
Part of:
Coordinates: 51° 6' 58.67" N    11° 7' 57.59" E
Show coordinates on a map

Technical Information

Dimensions

span 36.70 m
bridge surface 629 m²
deck deck width 16.50 m

Quantities

deck structural steel 106 t
concrete volume 262 m³
reinforcing steel 39 t
substructure concrete volume 955 m³
reinforcing steel 145 t

Cost

cost of construction Euro 950 000

Materials

deck slab reinforced concrete
abutments reinforced concrete
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20018853
  • Published on:
    09/12/2005
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine