0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2000
Completion: 2002
Status: in use

Project Type

Structure: Double-leaf bascule bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge

Location

Location: , , ,
Crosses:
  • Schlei River
Replaces: Schleibrücke (1927)
Coordinates: 54° 39' 33.96" N    9° 56' 8.96" E
Show coordinates on a map

Technical Information

Dimensions

total length 207.5 m
span lengths 3 x 32.50 m - 36.00 m (= 2 x 18.00 m) - 2 x 31.75 m
bridge surface 4 600 m²
length of movable section 36.0 m
deck deck width 23.00 m

Quantities

deck structural steel 530 t + 670 t
concrete volume 3 000 m³
prestressing steel 120 t
reinforcing steel 320 t
substructure concrete volume 18 000 m³
reinforcing steel 1 700 t

Cost

cost of construction Euro 23 000 000

Materials

deck of approach viaducts prestressed concrete
bascule span steel

Chronology

April 2000

Construction begins.

November 2002

Completion.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20010041
  • Published on:
    21/08/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine