General Information
Other name(s): | Tunnel de Schirmeck |
---|---|
Beginning of works: | 7 November 2003 |
Completion: | 28 January 2007 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Drilling and blasting |
Location
Location: |
Schirmeck, Bas-Rhin (67), Grand-Est, France |
---|---|
Coordinates: | 48° 28' 39" N 7° 13' 12.58" E |
Coordinates: | 48° 28' 18.72" N 7° 13' 5.94" E |
Technical Information
Dimensions
clearance | 4.30 m | |
horizontal radius of curvature | 900 m | |
tunnel length | 610 m | |
tunnel section area | 95 m² | |
length of bored tunnels | 529 m | |
number of lanes | 2 | |
roadway / carriageway width | 9.00 m | |
security tunnel | length | 150 m |
tunnel section area | 9 m² |
Materials
tunnel |
reinforced concrete
(B 35)
|
---|
Chronology
7 November 2003 | Beginning of construction. |
---|
Notes
The tunnel is located on the ring road around Schirmeck, part of the RN 420 connection Strasbourg and Saint-Dié.
Participants
Owner
Client
Main contractor
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le tunnel de la déviation de Schirmeck dans le massif vosgien. In: Travaux, n. 822 (September 2005), pp. 46-50. (2005):
- Tunnel de Schirmeck, percement sous hautes contraintes. In: Chantiers de France, n. 378 (March 2005), pp. 24-25. (2005):
- About this
data sheet - Structure-ID
20011569 - Published on:
12/03/2004 - Last updated on:
28/05/2021