0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1995
Completion: 1996
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Road bridge
Structure: Truss arch bridge
Material: Steel bridge
Support conditions:

Location

Location: , , ,
Crosses:
  • Mittellandkanal
Part of:
Replaces: Schierholzstrasse Bridge (1913)
Coordinates: 52° 24' 0.71" N    9° 49' 15.30" E
Show coordinates on a map

Technical Information

Dimensions

span 67.30 m
total width 20.90

Materials

deck steel
arches steel tubes
abutments reinforced concrete

Chronology

January 1995

Construction begins.

June 1996

Completion.

June 1996

Opened to traffic.

Participants

Design
Architecture
Structural engineering
Checking engineering
  • Beil (checking engineer)
Main contractor
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008719
  • Published on:
    21/03/2003
  • Last updated on:
    20/07/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine