0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: May 2012
Completion: 27 October 2017
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method
Drilling and blasting
Excavation by excavator

Location

Location: , , ,
, , ,
Coordinates: 48° 30' 7.40" N    9° 14' 9.32" E
Coordinates: 48° 29' 5.32" N    9° 14' 1.35" E
Show coordinates on a map

Technical Information

Dimensions

crossing tubes number 7
emergency access tube total length 1 940 m
clear interior profile 2.80 m x 3.10 m
length of bored tunnels 1 620 m
length of cut-and-cover section 320 m
total excavated section 20 m²
main tube length 1 910 m
clear interior profile 9.50 m x 4.50 m
length of bored tunnels 1 620 m
length of cut-and-cover section 290 m
total excavated section ca. 99 m²

Quantities

emergency access tube volume of extracted material 40 000 m³
main tube volume of extracted material 210 000 m³
tunnels concrete volume 90 000 m³
reinforcing steel 8 000 t

Cost

technical equipment cost of construction ca. Euro 15 000 000
tunnels cost of construction ca. Euro 85 000 000

Materials

tunnel structure shotcrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20064316
  • Published on:
    13/11/2012
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine