General Information
Completion: | January 2003 |
---|---|
Status: | in use |
Project Type
Structure: |
Twin girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-prestressed concrete composite bridge |
Location
Location: |
Plomb, Manche (50), Normandy, France |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 48° 44' 15.85" N 1° 17' 38.84" W |
Technical Information
Dimensions
height | 31 m | |
total length | 347 m | |
span lengths | 57 m - 69 m - 81 m - 78 m - 60 m | |
number of spans | 5 | |
on-center distance between girders | 12 m | |
girder depth | 5.50 m | |
deck | deck width | 23.5 m |
deck slab thickness | 24 cm |
Quantities
structural steel | 2 250 t | |
concrete volume | 8 700 m³ | |
reinforcing steel | 2 250 t |
Materials
deck slab |
prestressed concrete
|
---|---|
girders |
steel
|
Chronology
January 2003 | Opened to traffic. |
---|
Participants
Owner
Client
Design
Architecture
- Laurent Barbier (architect)
Civil works
Steel construction
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A84 - Le viaduc de Saultbesnon. In: Bulletin annuel de l'AFGC, n. 4 (January 2002), pp. 22-25.
- About this
data sheet - Structure-ID
20008086 - Published on:
10/02/2003 - Last updated on:
09/04/2016