General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Japan |
---|
Technical Information
Dimensions
total length | 390 m | |
span lengths | 13 x 30 m | |
number of spans | 13 | |
deck | deck depth | 2.30 m |
deck width | 12.20 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20011016 - Published on:
14/12/2003 - Last updated on:
05/02/2016