General Information
Completion: | 2005 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Three-span extradosed bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Sannohe, Aomori, Japan Takko, Aomori, Japan |
---|---|
Coordinates: | 40° 22' 19.46" N 141° 17' 14.76" E |
Technical Information
Dimensions
main span | 200 m | |
total length | 400 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
pylons |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Consulting engineers
Co-contractor
Stay cables
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Weltrekord für eine „extradosed" Brücke mit Litzenzuggliedern. Sannohe-Boukyo-Brücke, Japan. In: DSI Info, n. 14 ( 2006- 2007), pp. 15.
- World Record for Extradosed Bridge with Extradosed Cables in Japan. Sannohe-Boukyo Bridge. In: DSI Info, n. 14 ( 2006- 2007), pp. 15.
- About this
data sheet - Structure-ID
20034430 - Published on:
12/02/2008 - Last updated on:
27/05/2021