General Information
Completion: | 1997 |
---|---|
Duration of works: | 5 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Vertical lift bridge |
Location
Location: |
Brig, Brig-Glis, Valais, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 46° 18' 57.15" N 7° 59' 15.35" E |
Technical Information
Dimensions
bridge surface | 210 m² |
Cost
cost of construction | Swiss Franc 2 200 000 |
Participants
Engineering
Relevant Web Sites
- About this
data sheet - Structure-ID
20019094 - Published on:
20/01/2006 - Last updated on:
05/02/2016