0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1997
Duration of works: 5 months
Status: in use

Project Type

Function / usage: Road bridge
Structure: Vertical lift bridge

Location

Location: , , ,
Crosses:
  • Saltina
Coordinates: 46° 18' 57.15" N    7° 59' 15.35" E
Show coordinates on a map

Technical Information

Dimensions

bridge surface 210 m²

Cost

cost of construction Swiss Franc 2 200 000

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20019094
  • Published on:
    20/01/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine