0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1993
Status: collapsed (2007)

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: ,
,

Technical Information

Dimensions

total length 520 m
number of spans 10

Materials

deck prestressed concrete

Chronology

25 February 2007

During tropical storm Gamède, the downstream Saint-Etienne bridge collapses after the piers fail due to the high water pressure. The upstream bridge remains standing but may be damaged.

Participants

Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20025062
  • Published on:
    13/11/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine