General Information
Other name(s): | Saint Croix River Bridge |
---|---|
Beginning of works: | 2014 |
Completion: | 2 August 2017 |
Status: | in use |
Project Type
Structure: |
Multi-span extradosed bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Stillwater, Washington County, Minnesota, USA Houlton, Saint Croix County, Wisconsin, USA |
---|---|
Crosses: |
|
Replaces: |
Stillwater Bridge (Minnesota) (1931)
|
Coordinates: | 45° 2' 31.82" N 92° 47' 5.50" W |
Technical Information
Dimensions
main spans | 4 x 182 m | |
length | ca. 917 m | |
span lengths | 104 m - 4 x 182 m - 104 m - 85 m | |
number of spans | 7 | |
number of lanes | 2 x 2 |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
pylons |
reinforced concrete
|
Excerpt from Wikipedia
The St. Croix Crossing is an extradosed bridge that spans the St. Croix River, between Oak Park Heights, Minnesota and St. Joseph, Wisconsin. Connecting Minnesota State Highway 36 and Wisconsin State Highway 64, the bridge carries four lanes of traffic (two lanes in each direction), and includes a bike/pedestrian path on the north side.
History
MnDOT, WisDOT, and the Federal Highway Administration were seeking a replacement for the nearly 90 year old Stillwater Bridge, which was frequently congested, inadequate for modern traffic, and was deteriorating from its age. The St. Croix River Crossing Project called for the construction of a new four-lane bridge less than a mile downriver, followed by the conversion of the Stillwater Bridge to pedestrian and bicycle use. Originally, construction of this bridge was planned to start in 2024, but legislation was passed requiring the Department of Transportation to address aging bridges by 2018, and the start date was moved up to 2013. However, on March 11, 2010, a federal judge ruled that the government had violated its rules in approving the bridge design, which sent the process back to an earlier stage. Because the bridge traverses the Saint Croix National Scenic Riverway, construction could only proceed following federal legislation which granted an exemption to the Wild and Scenic Rivers Act.
Construction on the bridge began with the piers in 2014. The bridge was opened to vehicle traffic following a ribbon-cutting ceremony on August 2, 2017.
Text imported from Wikipedia article "St. Croix Crossing" and modified on April 11, 2020 according to the CC-BY-SA 4.0 International license.
Participants
Relevant Web Sites
Relevant Publications
- (2014): Development of the St Croix River Extradosed Bridge Form. Presented at: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, pp. 1888-1895.
- (2019): Extradosed Bridges. International Association for Bridge and Structural Engineering (IABSE), Zurich (Switzerland), ISBN 978-3-85748-168-0, pp. 116.
- About this
data sheet - Structure-ID
20014211 - Published on:
01/11/2004 - Last updated on:
16/01/2020