0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Status: in use

Project Type

Material: Prestressed concrete bridge
Function / usage: Road bridge
Structure: main bridge:
Haunched girder bridge
Construction method: main bridge:
Balanced cantilever method
Material: Structurae Plus/Pro - Subscribe Now!
Construction method: approach viaduct:
Span-by-span in-situ casting on falsework
Structure: approach viaduct:
Double T-section girder bridge

Location

Location: ,
Crosses:
  • Sabor River
Coordinates: 41° 17' 13.60" N    6° 52' 26.12" W
Show coordinates on a map

Technical Information

Dimensions

total length 528 m
number of spans 9
piers height ca. max. 50 m
approach viaduct
number of spans 6
main bridge
main span 130 m
number of spans 3

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20012533
  • Published on:
    26/07/2004
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine