General Information
Status: | in use |
---|
Project Type
Material: |
Prestressed concrete bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
main bridge: Haunched girder bridge |
Construction method: |
main bridge: Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
approach viaduct: Span-by-span in-situ casting on falsework |
Structure: |
approach viaduct: Double T-section girder bridge |
Location
Technical Information
Dimensions
total length | 528 m | |
number of spans | 9 | |
piers | height | ca. max. 50 m |
approach viaduct | ||
---|---|---|
number of spans | 6 | |
main bridge | ||
main span | 130 m | |
number of spans | 3 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Designing bridges - A quest for beauty. Presented at: fib Symposium 2004, 26-28 April 2004, Avignon, pp. 35-50. (2004):
- About this
data sheet - Structure-ID
20012533 - Published on:
26/07/2004 - Last updated on:
05/02/2016