0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Official designation: BW 0163
Beginning of works: 2015
Completion: 2016
Status: in use

Project Type

Location

Location: , ,
Address: B 91
Coordinates: 51° 24' 27.24" N    11° 58' 48.04" E
Show coordinates on a map

Technical Information

Dimensions

width 13.30 m
total length 144.00 m
span lengths 26.04 m - 3 x 30.35 m - 27.07 m
number of spans 5
bridge surface 1 917 m²
deck deck depth 1.40 m
pile caps thickness 1.50 m
piles diameter 1.0 m
length 9.50 - 16.50 m

Quantities

concrete volume 2 375 m³
prestressing steel 53 t
reinforcing steel 343 t
piles total length of piles 740 m

Cost

cost of construction ca. Euro 3 620 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2017): Chronik des Brückenbaus. In: Curbach, Manfred (2017): 27. Dresdner Brückenbausymposium., ISBN 978-3-86780-510-0, pp. 187-202.
  • About this
    data sheet
  • Structure-ID
    20074909
  • Published on:
    20/03/2018
  • Last updated on:
    20/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine