Official designation: | BW 3/05 |
---|---|
Beginning of works: | 1995 |
Completion: | 1997 |
Duration of works: | 30 months |
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Movable Scaffolding System |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Schkortleben, Weißenfels, Burgenlandkreis, Saxony-Anhalt, Germany |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Coordinates: | 51° 14' 41.05" N 12° 1' 28.02" E |
Technical Information
Dimensions
width | 30.5 m | |
total length | 860 m | |
span lengths | 52 m - 68 m - 84 m - 112 m - 84 m - 6 x 68 m - 52 m | |
number of spans | 12 | |
bridge surface | 26 230 m² | |
height above valley floor or water | max. 24 m | |
deck | deck depth | 3.00 - 5.25 m |
Quantities
concrete volume | 37 000 m³ | |
prestressing steel | 1 250 t | |
reinforcing steel | 4 000 t |
Cost
cost of construction | German Mark 53 000 000 | |
cost of construction per m² | German Mark 2 001.00 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Original design
Architecture
- Hans-Günther Burkhardt (architect)
Alternative design
Structural engineering
Checking engineering
- György Iványí (checking engineer)
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Betonbau in Forschung und Praxis, Festschrift für G. Iványi. Eine frühe Spannbeton-Straßenbrücke nach dem Verfahren Freyssinet. Verlag Bau+Technik, Düsseldorf (Germany). (1999):
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 47-52.
- About this
data sheet - Structure-ID
20003995 - Published on:
25/06/2002 - Last updated on:
05/02/2016