General Information
Completion: | 2020 |
---|---|
Status: | under construction |
Project Type
Function / usage: |
Railroad (railway) tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Berlin-Moabit, Mitte, Berlin, Germany |
---|---|
Part of: | |
Underneath of: |
Hochhaus am Europaplatz (2023)
|
Coordinates: | 52° 31' 48.70" N 13° 21' 56.22" E |
Technical Information
Dimensions
tunnel length | ca. 609 m | |
trough | length | 191m |
Participants
Owner
Design
Co-contractor
Construction management
Construction supervision
Project direction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Innerstädtischer Tunnelbau - Herausforderungen des Spezialtiefbaus am Beispiel der S-Bahnlinie S21 in Berlin. In: geotechnik, v. 38, n. 2 ( 2015), pp. 144-151. (2015):
- About this
data sheet - Structure-ID
20066910 - Published on:
08/03/2015 - Last updated on:
21/08/2021