0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 26 August 2019
Completion: 13 March 2020
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Butanga river.
Coordinates: 1° 48' 5.87" S    29° 17' 51.56" E
Show coordinates on a map

Technical Information

Dimensions

span 45 m

Materials

cables steel wire
deck steel
anchorages reinforced concrete

Notes

The bridge built by Bridges to Prosperity serves around 1641 people.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084703
  • Published on:
    25/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine