General Information
Name in local language: | Innbrücke Rotholz |
---|---|
Completion: | 2002 |
Status: | in use |
Project Type
Structure: |
Axial (single) truss bridge |
---|---|
Function / usage: |
Road bridge Railroad (railway) bridge |
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Warren type truss bridge |
Location
Location: |
Jenbach, Tyrol, Austria Strass im Zillertal, Tyrol, Austria |
---|---|
Crosses: |
|
Coordinates: | 47° 23' 31" N 11° 47' 45" E |
Technical Information
Dimensions
length | 128.5 m | |
span lengths | 34.3 m - 44.1 m - 34.3 m | |
number of spans | 3 | |
truss | height | 5.50 m |
Quantities
structural steel | 230 t |
Materials
deck |
reinforced concrete
|
---|---|
truss |
steel
|