General Information
Completion: | 1932 |
---|---|
Status: | in use |
Project Type
Structure: |
Three-hinged arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Schwarzenburg, Berne, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 46° 49' 40.05" N 7° 23' 53.84" E |
Technical Information
Dimensions
arch span | 82 m |
Materials
deck |
reinforced concrete
|
---|---|
arch |
reinforced concrete
|
Participants
Structural engineering
- Robert Maillart (structural engineer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2017): Restoration of Robert Maillart's Reinforced Concrete Bridges in Switzerland. In: (2017): Engineering History and Heritage Structures – Viewpoints and Approaches. International Association for Bridge and Structural Engineering (IABSE), Zurich (Switzerland), ISBN 978-3-85748-154-3, pp. 155-160.
- Robert Maillart. Designer, Builder, Artist. Cambridge University Press, Cambridge (United Kingdom), pp. 169-172. (1997):
- Robert Maillart and the Art of Reinforced Concrete. The MIT Press, Cambridge (USA), pp. 64-66. (1990):
- Tierra sobre el agua. Visión histórica universal de los puentes. Colegio de Ingenieros de Caminos, Canales y Puertos, Madrid (Spain), pp. 353. (1999):
- About this
data sheet - Structure-ID
20001007 - Published on:
30/09/2000 - Last updated on:
26/08/2021