General Information
Name in local language: | Rosensteinsteg II; Fußgängerbrücke Rosensteinpark II |
---|---|
Completion: | 2019 |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Stressed ribbon bridge |
Material: |
Textile-reinforced concrete bridge |
Location
Location: |
Stuttgart, Baden-Württemberg, Germany |
---|---|
Replaces: |
Rosenstein Park Pedestrian Bridge II (1977)
|
Coordinates: | 48° 47' 57.18" N 9° 12' 29.96" E |
Technical Information
Dimensions
width | 3.30 m | |
span | 28.865 m |
Materials
deck slab |
carbon-fiber reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
Participants
Owner
Design
Checking engineering
-
Peter und Lochner Beratende Ingenieure für Bauwesen GmbH
- Roland Wetzel (checking engineer)
General contractor
Steel construction
Precastor
Subcontractor
Cables
Material testing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Rosensteinsteg II—A cable footbridge with deck elements of CFRP‐reinforced concrete. In: Structural Concrete, v. 24, n. 4 (5 July 2023), pp. 4476-4479. (2023):
- Der Wiederaufbau des Rosensteinstegs II in Stuttgart mit Überbauelementen aus Carbonbeton. In: Bauingenieur, v. 95, n. 7-8 (July 2020), pp. 243-253. (2020):
- About this
data sheet - Structure-ID
20080291 - Published on:
02/11/2020 - Last updated on:
13/08/2023