General Information
Completion: | 1972 |
---|---|
Status: | in use |
Project Type
Structure: |
Mast-supported membrane structure |
---|---|
Function / usage: |
Stadium / Arena |
Structure: |
Cable net |
Awards and Distinctions
2013 |
award winner
for registered users |
---|
Location
Location: |
Milbertshofen-Am Hart, Munich, Bavaria, Germany |
---|---|
Part of: | |
Coordinates: | 48° 10' 29" N 11° 32' 51" E |
Technical Information
Dimensions
covered area | 74 000 m² |
Materials
masts |
steel
|
---|---|
membrane |
acrylic panels
|
cable net |
steel
|
Participants
Structural engineering
- Jörg Schlaich (structural engineer)
Engineering
- Günter Mayr (engineer)
Cables
(role unknown)
Relevant Web Sites
Relevant Publications
- L'architecture et les ingénieurs. Deux siècles de réalisations. Moniteur, Paris (France), pp. 77. (1997):
- Architekturführer München. Architectural Guide to Munich. 2nd edition, Dietrich Riemer Verlag, Berlin (Germany), pp. 158. (2002):
- L'art de l'ingénieur. constructeur, entrepeneur, inventeur. Éditions du Centre Georges Pompidou, Paris (France), pp. 320-321. (1997):
- Baumeister in einer umwälzenden Zeit. Deutsche Verlags-Anstalt, Stuttgart (Germany), pp. 221-230. (1984):
- Gesamtanlage und Hauptsportstätten für die Olympischen Spiele 1972, München - Site and Main Sporting Arenas for the 1972 Olympic Games in Munich. In: Detail - Zeitschrift für Architektur + Baudetail, v. 40, n. 8 (December 2000), pp. 1469-1473.
- About this
data sheet - Structure-ID
20000382 - Published on:
08/09/1999 - Last updated on:
29/07/2014