• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Share

Follow

Roof for the Arena in Zaragoza

General Information

Beginning of works: 1988
Completion: 1988
Status: in use

Project Type

Location

Location: , , ,
Is supported by: Plaza de Toros de Zaragoza (1917)
Coordinates: 41° 39' 16.03" N    0° 53' 29.59" W
Show coordinates on a map

Technical Information

Dimensions

height 15 m
membrane covered area 5 400 m²

Materials

membrane PVC-coated polyester fabric

Chronology

June 1988
- September 1988

Design period

August 1988
- October 1988

Construction period.

Notes

1 000 m² of the roof are retractable

Advertisement

Participants

Client
Architecture
Structural engineering
Material supplier

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000744
  • Date created
    20/05/2000
  • Last Update
    30/07/2016