General Information
Other name(s): | Isaac Lee Patterson Bridge |
---|---|
Beginning of works: | 1930 |
Completion: | 1932 |
Status: | completed |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Reinforced concrete bridge |
Awards and Distinctions
1982 |
for registered users |
---|
Location
Location: |
Gold Beach, Curry County, Oregon, USA |
---|---|
Crosses: |
|
Coordinates: | 42° 25' 38.28" N 124° 24' 48.02" W |
Technical Information
Dimensions
total length | 591.10 m | |
span lengths | 7 x 70.15 m | |
number of spans | 7 |
Materials
arches |
reinforced concrete
|
---|
Participants
Design
- Conde Balcom McCullough (designer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridging the World. Bridge Ink, Wilsonville (USA). (2003):
- Elegant Arches, Soaring Spans. C.B. McCullough Oregon's Master Bridge Builder. Oregon State University Press, Corvallis (USA), pp. 138. (2001):
- The Freyssinet Method Of Arch Construction Applied To The Rogue River Bridge In Oregon. In: Journal of the American Concrete Institute (ACI Journal Proceedings), v. 29, n. 2 ( 1933).
- Les grands ponts du monde: Hors d'Europe. Brissaud, Poitiers (France), pp. 138-139. (1990):
- Great American Bridges and Dams. A National Trust Guide. John Wiley & Sons, New York (USA), pp. 302. (1984):
- About this
data sheet - Structure-ID
20000506 - Published on:
16/11/1999 - Last updated on:
26/02/2019