General Information
Name in local language: | Terceira Ponte de Rio Branco |
---|---|
Beginning of works: | 2003 |
Completion: | 2006 |
Status: | in use |
Project Type
Structure: |
Three-span extradosed bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Rio Branco, Acre, Brazil |
---|---|
Crosses: |
|
Coordinates: | 10° 0' 42.44" S 67° 50' 36.56" W |
Technical Information
Dimensions
total length | 198.0 m | |
span lengths | 54 m - 90 m - 54 m | |
number of spans | 3 | |
number of lanes | 2 x 2 | |
abutments | number | 2 |
deck | deck depth | 2.00 - 2.50 m |
deck width | 21.1 m | |
pylons | height | ca. 27.5 m |
number | 2 x 2 |
Materials
deck |
prestressed concrete
|
---|---|
pylons |
reinforced concrete
|
Notes
First extradosed bridge to be built in Brazil.
Participants
Design
Structural engineering
- Iberê Martins da Silva (structural engineer)
- Rui Nobhiro Oyamada (structural engineer)
- Viviane Marta Tanizaki (structural engineer)
- Tunehiro Uono (structural engineer)
- Manoel Rodrigues da Rocha Junior (structural engineer)
Consulting engineers
- Hideki Ishitani (consulting engineer)
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ponte protendida no extradorso (extradosed) sobre o Rio Acre. Presented at: O Betão nas Estruturas - SIABE 05; Coimbra, Portugal; 05-07.07.2005. (2005):
- About this
data sheet - Structure-ID
20016087 - Published on:
13/04/2005 - Last updated on:
11/09/2020