0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 12 July 1998
Completion: June 2001
Status: in use

Project Type

Location

Location: , , ,
Address: B 169
Crosses:
  • Elbe River
Replaces: Riesa Bridge (1959)
Coordinates: 51° 18' 38" N    13° 17' 44" E
Show coordinates on a map

Technical Information

Dimensions

total length 365.00 m
span lengths 65.00 m - 105.00 m - 77.00 m - 67.00 m - 51.00 m
number of spans 5
superstructure deck depth 2.60 - 5.30 m
deck width 11.45 m + 10.05 m

Quantities

superstructure structural steel 2 170 t
concrete volume 3 230 m³
reinforcing steel 680 t

Cost

cost of construction German Mark 23 500 000

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20079059
  • Published on:
    19/01/2020
  • Last updated on:
    19/01/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine