General Information
Other name(s): | Mainbrücke Retzbach-Zellingen |
---|---|
Beginning of works: | 1991 |
Completion: | 1993 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Zellingen, Main-Spessart, Bavaria, Germany |
---|---|
Crosses: |
|
Coordinates: | 49° 54' 13.23" N 9° 48' 40.58" E |
Technical Information
Dimensions
main span | 126.0 m | |
total length | 566 m | |
bridge surface | 7.641 m² |
Quantities
concrete volume | 7 400 m³ | |
reinforcing steel | 1 100 t |
Cost
cost of construction | ca. German Mark 26 000 000 |
Materials
deck |
prestressed concrete
|
---|
Participants
Alternative design
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Unusual applications of the incremental launching method. Presented at: IABSE Symposium: Bridges - Interaction between construction technology and design, Leningrad, USSR, 1991, pp. 265-270. (1991):
- About this
data sheet - Structure-ID
20006243 - Published on:
15/10/2002 - Last updated on:
17/03/2019