General Information
Completion: | 2008 |
---|---|
Status: | in use |
Project Type
Material: |
Reinforced concrete bridge |
---|---|
Support conditions: |
for registered users |
Structure: |
Rigid frame bridge |
Function / usage: |
Road bridge |
Location
Location: |
Rutesheim, Böblingen (Kreis), Baden-Württemberg, Germany |
---|---|
Address: | Renninger Straße |
Crosses: |
A 8 Motorway (Germany)
|
Coordinates: | 48° 48' 4.63" N 8° 56' 24.79" E |
Technical Information
Dimensions
total length | 65 m | |
span | 60 m |
Participants
Design
Relevant Web Sites
- About this
data sheet - Structure-ID
20067856 - Published on:
08/10/2015 - Last updated on:
05/02/2016