General Information
Completion: | 1998 |
---|---|
Status: | in use |
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Material: |
Reinforced concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nuremberg, Bavaria, Germany |
---|---|
Crosses: |
|
Next to: |
Rednitztalbrücke
|
Coordinates: | 49° 21' 45.29" N 11° 2' 26.14" E |
Technical Information
Dimensions
width | 7.12 m | |
span lengths | 18.00 m - 26.96 m - 26.98 m - 26.77 m - 26.58 m - 26.38 m - 18.00 m | |
number of spans | 7 |
Cost
cost of construction | German Mark 4 000 000 |
Materials
deck |
reinforced concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Alternative design
Structural engineering
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Langzeitverhalten einer 170 m langen integralen Eisenbahnbrücke. Messungen und Modellbildung zur Interaktion Boden/Bauwerk/lückenloses Gleis am Beispiel der Rednitztalbrücke. In: Bautechnik, v. 96, n. 2 (February 2019), pp. 120-132. (2019):
- About this
data sheet - Structure-ID
20006852 - Published on:
14/11/2002 - Last updated on:
04/02/2020