General Information
Completion: | 2016 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
main bridge: Rigid frame bridge with V-shaped legs |
Material: |
main bridge: Steel-reinforced concrete composite bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! ramps: Reinforced concrete bridge |
Structure: |
ramps: Slab bridge |
Location
Technical Information
Dimensions
total length | 210 m | |
pier 6 | height | 1.85 m + 5.25 m |
abutments | ||
---|---|---|
length | 15 m | |
main bridge | ||
length | 106 m | |
span lengths | 17 m - 2 x 36 m - 17 m | |
number of spans | 4 | |
deck slab thickness | max. 0.13 m | |
girder depth | 1.20 m | |
total width | 4.30 m | |
walkway width | 3.35 m | |
northern ramp | ||
length | 61 m | |
span lengths | 8 m - 5 x 9 m - 8 m | |
number of spans | 7 | |
deck slab thickness | 0.44 m | |
total width | 3.60 m | |
walkway width | 3.20 m | |
southern ramp | ||
length | 43 m | |
span lengths | 8 m - 3 x 9 m - 8 m | |
number of spans | 5 | |
deck slab thickness | 0.44 m | |
total width | 3.60 m | |
walkway width | 3.20 m |
Cost
cost of construction | Euro 1 306 178.06 |
Materials
piers |
steel
reinforced concrete |
---|---|
deck of main bridge |
composite steel-reinforced concrete
|
deck of approach viaducts |
reinforced concrete
|
piles |
reinforced concrete
|
abutments |
reinforced concrete
|
pile caps |
reinforced concrete
|
Participants
Design
Contractor
Relevant Web Sites
Relevant Publications
- (2017): Design of Raos Footbridge over the A-67 Motorway, Santander (Spain). Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin).
- About this
data sheet - Structure-ID
20074504 - Published on:
07/01/2018 - Last updated on:
30/08/2018