General Information
Completion: | June 2003 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Cable-stayed bridge with harp system Two-span cable-stayed bridge |
Material: |
Steel-reinforced concrete composite bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Santurtzi, Biscay, Basque Country, Spain |
---|---|
Coordinates: | 43° 19' 15.57" N 3° 2' 23.16" W |
Technical Information
Dimensions
span lengths | 44.00 m - 16.06 m - 12.61 m -10.95 m | |
number of spans | 4 | |
walkway width | 3.00 m | |
cables | total length | 570 m |
deck | deck depth | 0.80 m |
deck slab thickness | 0.10 m | |
pylons | diameter | 1.00 m |
height | 29.32 m | |
angle of inclination | 9.45° |
Cost
cost of construction | Euro 690 000 |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
pylons |
steel tubes
|
Participants
Design
Structural engineering
Stay cables
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Innovative solutions for urban footbridges. Presented at: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005. (2005):
- About this
data sheet - Structure-ID
20072678 - Published on:
04/03/2017 - Last updated on:
30/08/2018