• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Rama VIII Bridge

General Information

Beginning of works: 1999
Completion: 7 May 2002
Status: in use

Project Type

Location

Location: ,
Crosses:
  • Chao Phraya River
Coordinates: 13° 46' 8.03" N    100° 29' 49.38" E
Show coordinates on a map

Technical Information

Dimensions

main span 300 m
total length 475 m
pylon height 160 m
stay cables number of cables 84

Materials

superstructure composite steel-reinforced concrete
pylon reinforced concrete

Advertisement

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000911
  • Published on:
    07/09/2000
  • Last updated on:
    28/11/2018