0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2005
Completion: 9 December 2012
Status: in use

Project Type

Function / usage: High-speed rail tunnel
Construction method: Tunnel boring machine (TBM)
Structure: Tunnel

Location

Location: , ,
Coordinates: 48° 14' 0.28" N    15° 42' 18.76" E
Coordinates: 48° 14' 19.96" N    15° 44' 27.96" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 2 775 m
excavation diameter 13.03 m

Participants

Owner
Structural engineering
Contractor
TBM manufacturer

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20040939
  • Published on:
    06/12/2008
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine