Railway and Roadway Bridge across the Danube at Belgrade
General Information
Completion: | 1961 |
---|---|
Status: | in use |
Project Type
Structure: |
Subdivided Warren truss bridge |
---|---|
Function / usage: |
Road bridge Railroad (railway) bridge |
Material: |
Steel bridge |
Location
Location: |
Belgrade, Serbia |
---|---|
Crosses: |
|
Replaces: |
Railway and Roadway Bridge across the Danube at Belgrade (1946)
|
Coordinates: | 44° 49' 42.53" N 20° 29' 30.85" E |
Technical Information
Dimensions
total length | 1 525.38 m | |
main spans | 161.300 m - 3 x 162.144 m - 161.300 m |
Materials
truss |
steel
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Belgrade Bridges across the Danube and Sava River. Presented at: 3. Internationale Donaubrückenkonferenz, 3rd International Conference on Bridges across the Danube, 29-30/10/1998, Regensburg, Germany, pp. 358-372. (1998):
- About this
data sheet - Structure-ID
20003749 - Published on:
20/06/2002 - Last updated on:
30/12/2019