0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1 August 2019
Completion: 3 July 2020
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Río Caine river.
Coordinates: 18° 12' 36.12" S    65° 35' 6.99" W
Show coordinates on a map

Technical Information

Dimensions

span 138 m

Materials

cables steel wire
anchorages reinforced concrete

Notes

The bridge built by Bridges to Prosperity serves around 285 people in the communities of Quioma; Molle Pampa.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084774
  • Published on:
    25/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine