0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Jambatan Pulau Muara Besar
Beginning of works: May 2015
Completion: May 2018
Status: in use

Project Type

Location

Location:
Coordinates: 5° 0' 18.03" N    115° 4' 33.33" E
Show coordinates on a map

Technical Information

Dimensions

width 23 m
total length 2 680 m
number of lanes 4
abutments number 2

Cost

cost of construction 260 000 000

Materials

piers reinforced concrete
abutments reinforced concrete

Excerpt from Wikipedia

Pulau Muara Besar Bridge is a dual-carriageway bridge which connects Pulau Muara Besar, an island on Brunei Bay, with the mainland of Brunei via Serasa in Brunei-Muara District. The bridge is 2,680 metres (8,790 feet) long and 23 metres (75 feet) wide. The construction began in 2015 and completed in May 2018; it was undertaken by China Harbour Engineering Company at a cost of B$260 million or US$204 million. The bridge is part of the road infrastructure that will serve the petrochemical refinery plant on the island, which is currently under construction, and is a Chinese foreign direct investment. At present, access to the bridge is restricted to authorised personnels of the project.

Text imported from Wikipedia article "Pulau Muara Besar Bridge" and modified on December 7, 2023 according to the CC-BY-SA 4.0 International license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20086815
  • Published on:
    05/09/2023
  • Last updated on:
    05/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine