General Information
Name in local language: | Viaducto de Pujayo |
---|---|
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Pujayo, Bárcena de Pie de Concha, Cantabria, Spain |
---|---|
Coordinates: | 43° 7' 18.40" N 4° 4' 54.67" W |
Technical Information
Dimensions
total length | 420.00 m | |
span lengths | 60.00 m - 3 x 100.00 m - 60.00 m | |
number of spans | 5 | |
horizontal radius of curvature | 600 m | |
deck | deck depth | 2.50 - 6.00 m |
deck width | 26.10 m | |
number of lanes | 2 + 3 | |
pier 1 | height | 28.0 m |
pier 2 | height | 64.0 m |
pier 3 | height | 60.0 m |
pier 4 | height | 34.4 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Design
-
Apia XXI
- Marcos J. Pantaleón Prieto (designer)
- Óscar Ramón Ramos Gutiérrez (designer)
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Construcción del Viaducto de Pujayo. Presented at: IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008. (2008):
- Viaducto de Pujayo. In: Hormigón y acero, v. 60, n. 252 (2nd Quarter 2009), pp. 37-52. (2009):
- About this
data sheet - Structure-ID
20048568 - Published on:
07/10/2009 - Last updated on:
05/02/2016