Pujayo Viaduct

The Pujayo Viaduct (which belongs to the Molledo ? Pesquera section of the Cantabria ? Meseta Highway) crosses over the valley of the Galeron River. The viaduct consists of a prestressed concrete bridge, constructed by the balanced cantilever method, with a total length of 420 m, distributed in 5 spans, perfectly placed into the valley. The 3 central spans are 100 m long, whereas the side ones are 60 m long. The monocelular box cross-section of the girder, with inclined webs, has a variable height, between 2.5 and 6.0 m. The highway consists of 2 roadways, one with 2 lanes and the other with 3 lanes, all of them placed in a single 26.10 m wide deck slab. The maximum height of the piers is 64 m. They have a rectangular cross-section, whose depths vary both linearly in longitudinal and transversal directions.

Keywords:
balanced cantilever prestressed concrete segments Instrumentation variable height bridge monitoring system
Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10075593
  • Published on:
    11/06/2018
  • Last updated on:
    11/06/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine