0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Puente de la Barra de Maldonado
Beginning of works: 1998
Completion: 1999
Status: in use

Project Type

Location

Location: , ,
, ,
Crosses:
  • Arroyo Maldonado
Next to: Puente Leonel Viera (1965)
Coordinates: 34° 54' 38.52" S    54° 52' 21.08" W
Show coordinates on a map

Technical Information

Dimensions

main span 90 m
total length 150 m
span lengths 30 m - 90 m - 30 m
number of spans 3
abutments number 2
piers number 2

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20090133
  • Published on:
    31/12/2024
  • Last updated on:
    31/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine