General Information
Other name(s): | Prym-Brücke |
---|---|
Official designation: | 4614 630 |
Beginning of works: | 1998 |
Completion: | 1998 |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Double T-section girder bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Location
Location: |
Arnsberg, Hochsauerlandkreis, North Rhine-Westphalia, Germany |
---|---|
Crosses: |
|
Next to: |
Rumbeck Railroad Bridge
|
Coordinates: | 51° 23' 44.62" N 8° 6' 14.43" E |
Technical Information
Dimensions
total length | 83.50 m | |
span lengths | 20.00 m - 37.00 m - 26.50 m | |
number of spans | 3 | |
deck | width | 2.85 m |
Materials
girder |
precast prestressed concrete
|
---|---|
deck slab |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Ruhrbrücken. Von der Quelle bis zur Mündung zwischen Einst und Jetzt. Ardey-Verlag, Münster (Germany), pp. 200-201. (2004):
- About this
data sheet - Structure-ID
20021181 - Published on:
03/05/2006 - Last updated on:
05/02/2016