0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2010
Completion: 8 January 2013
Status: in use

Project Type

Function / usage: High-speed rail tunnel
Structure: Tunnel
Construction method: Tunnel boring machine (TBM)

Location

Location: , , ,
Part of:
Coordinates: 41° 22' 48.70" N    2° 8' 32.20" E
Coordinates: 41° 24' 57.60" N    2° 11' 31.80" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 5 780 m
TBM length 105 m
weight 2 300 t

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20022073
  • Published on:
    03/07/2006
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine