0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1992
Completion: 1997
Status: in use

Project Type

Location

Location: , , ,
Impounds:
  • Guadalimar River
Near: Giribaile Dam Intake Tower Acces Bridge (1997)
Coordinates: 38° 5' 29.17" N    3° 30' 44.27" W
Show coordinates on a map

Technical Information

Dimensions

height 89 m
retained water volume 2 400 000 m³
crest length 685.80 m
crest thickness 10 m
base thickness 378 m

Notes

Largest earthfill dam in Spain.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20012028
  • Published on:
    10/05/2004
  • Last updated on:
    23/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine