General Information
Completion: | 2020 |
---|---|
Status: | project phase |
Project Type
Structure: |
Cable-stayed bridge with harp system |
---|---|
Function / usage: |
Motorway / Freeway / Interstate |
Structure: |
Two-span cable-stayed bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Port, Berne, Switzerland Brügg, Berne, Switzerland |
---|---|
Coordinates: | 47° 7' 7.08" N 7° 15' 27.38" E |
Technical Information
Dimensions
deck depth | 1.30 m | |
main spans | 84 m - 86 m | |
deck width | 17 - 19 m |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2015): ArtStructures, From competition to completion using the synthetic design method. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, pp. 484-493.
- About this
data sheet - Structure-ID
20071230 - Published on:
20/05/2016 - Last updated on:
28/09/2016