General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Alenquer, Lisbon, Portugal |
---|---|
Crosses: |
|
Coordinates: | 39° 0' 45.47" N 8° 56' 1.69" W |
Technical Information
Dimensions
total length | 12 km | |
northern approach viaduct | length | 1.7 km |
southern approach viaduct | length | 9 230 m |
main bridge | ||
---|---|---|
length | 972 m | |
span lengths | 95 m - 127 m - 133 m - 4 x 130 m - 95 m | |
number of spans | 8 |
Cost
cost of construction | Euro 192 000 000 |
Materials
deck |
prestressed concrete
|
---|
Participants
Design
Architectural consulting
- Charles Lavigne (architectural consultant)
Co-contractor
- Construtora do Tamega, Ldª
- Lena Construçoes
- MSF
- Novopca
- Odebrecht Bento Pedroso
- Zagope - Construções e Engenharia, S.A.
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Tagus Triumph. In: Bridge Design & Engineering, n. 48 (3rd Quarter 2007), pp. 37. (2007):
- About this
data sheet - Structure-ID
20035463 - Published on:
12/03/2008 - Last updated on:
05/02/2016