0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2003
Completion: 2007
Duration of works: 21 months
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Tagus River
Coordinates: 39° 0' 45.47" N    8° 56' 1.69" W
Show coordinates on a map

Technical Information

Dimensions

total length 12 km
northern approach viaduct length 1.7 km
southern approach viaduct length 9 230 m
main bridge
length 972 m
span lengths 95 m - 127 m - 133 m - 4 x 130 m - 95 m
number of spans 8

Cost

cost of construction Euro 192 000 000

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Perry da Câmara, António (2007): Tagus Triumph. In: Bridge Design & Engineering, n. 48 (3rd Quarter 2007), pp. 37.
  • About this
    data sheet
  • Structure-ID
    20035463
  • Published on:
    12/03/2008
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine