0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Pont de Sapiac
Completion: 1912
Status: in use

Project Type

Awards and Distinctions

Location

Location: , , ,
Crosses:
  • Tarn River
Next to: Sapiac Bridge
Coordinates: 44° 0' 51" N    1° 20' 56" E
Show coordinates on a map

Technical Information

Dimensions

total length 137 m
rise:span 1:6
span lengths 53 m - 56 m
number of spans 2
number of lanes 2
abutments number 2
pier number 1

Materials

deck reinforced concrete
arches reinforced concrete
piers on arch reinforced concrete

Chronology

1910

Design competition with the prerequisite of designing a concrete bridge. Jury is presided by Charles Rabut. Boussiron's design is retained.

3 March 1930

One of the few bridges over the Tarn to resist a large flood.

Participants

Design
Construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000157
  • Published on:
    24/04/1999
  • Last updated on:
    15/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine