General Information
Completion: | 2011 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Steel bridge |
Location
Location: |
Paris (12th), Paris, Ile-de-France, France Paris (13th), Paris, Ile-de-France, France |
---|---|
Crosses: |
|
Is supported by: |
National Bridge (1953)
|
Coordinates: | 48° 49' 40.45" N 2° 23' 14.20" E |
Technical Information
Dimensions
deck depth | 0.30 - 0.75 m |
Cost
construction cost (without tax) | Euro 12 000 000 |
Materials
deck |
steel
|
---|---|
supports |
steel
|
Participants
Owner
Architecture
Structural engineering
Contractor
Steel construction
Relevant Web Sites
Relevant Publications
- Widening Existing Bridges with Lateral Footbridges: the Challenge of Matching Old and New. Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- About this
data sheet - Structure-ID
20072163 - Published on:
17/11/2016 - Last updated on:
08/06/2018