General Information
Project Type
Structure: |
Deck arch bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Function / usage: |
Bicycle and pedestrian bridge |
Location
Location: |
Nanterre, Hauts-de-Seine (92), Ile-de-France, France Bezons, Val-d'Oise (95), Ile-de-France, France |
---|---|
Crosses: |
|
Is supported by: |
Pont Jacques-Boulloche (1953)
|
Coordinates: | 48° 55' 14.62" N 2° 13' 13.96" E |
Coordinates: | 48° 55' 13.81" N 2° 13' 12.81" E |
Technical Information
Dimensions
span lengths | 55 m - 95 m - 55 m | |
number of spans | 3 | |
walkway width | 3.46 m |
Quantities
structural steel | 600 t | |
concrete volume | 600 m³ | |
reinforcing steel | 86 t |
Materials
arches |
steel
|
---|---|
deck slab |
reinforced concrete
|
girders |
steel
|
Participants
Design
Co-contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Widening Existing Bridges with Lateral Footbridges: the Challenge of Matching Old and New. Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- About this
data sheet - Structure-ID
20072319 - Published on:
23/12/2016 - Last updated on:
09/06/2017